Check the key projects we are implementing.
Drawing from the extensive experience of our employees and best practices in project implementation, we provide services to clients in both the private and public sectors at every stage of the process: from planning and design to implementation, project execution, and then maintenance and warranty services.
Among our completed projects, we can highlight telecommunications and railway infrastructure projects for both national and local operators and clients. We have participated in projects of significant importance for the development of telecommunications networks in Poland and Western European countries, using FTTH and P2P technologies.
We are also proud of our contribution to the development of environmentally friendly rail transport – we actively participate in the expansion of the railway traffic control system, which is crucial not only for Polish railways but also for the entire Three Seas region – the Baltic States and Central and Eastern Europe. The GSMR project we are implementing is the first step in increasing safety on the railways and improving the capacity of active connections. We face new challenges and global design standards – actively participating in the design and supervision of the construction of new railway lines.

Construction of the ERTMS/GSM-R system infrastructure on railway lines of PKP Polskie Linie Kolejowe S.A. under the NPW ERTMS project.
Design and execution of construction works as part of the investment titled: “Construction of the ERTMS/GSM-R system infrastructure on railway lines of Polskie Linie Kolejowe S.A. under the NPW ERTMS project.”
INVESTOR / CLIENT
PKP Polskie Linie Kolejowe S.A.

The work was carried out as part of the task: “Implementation of the ERTMS/ETCS Level 2 system, along with the construction of LCS and automatic line block signaling, on the section of railway line No. 4, Korytów – Zawiercie,” which is part of the project titled “Modernization of Railway Line No. 4 – Central Railway Main Line Stage II” on the section: Włoszczowa Północ – Psary – Góra Włodawska – Zawiercie.
Scope: 72.5 km
Investor: PKP PLK S.A.
Client: Rail Engineering Sp. z o.o.

Scope: 53 km
Investor: GAZ SYSTEM S.A.
Client: Antea Polska S.A.

Execution of design work titled: “Completion of the railway network with the railway connection between Jastrzębie-Zdrój and Katowice,” carried out under the Local and Regional Railway Infrastructure Supplement Program – Kolej + until 2029.
Scope: 00+334 – 12+970; 27+413 – 34+747
Investor/Client: PKP Polskie Linie Kolejowe S.A.

Execution of design work titled: “Increasing the capacity of railway line No. 140 on the section Katowice Ligota – Orzesze Jaśkowice by constructing a second track and additional passenger stops,” carried out under the Local and Regional Railway Infrastructure Supplement Program – Kolej + until 2029.
Scope: 3+079 – 21+251
Investor/Client: PKP Polskie Linie Kolejowe S.A.

Work carried out as part of Task No. 2: “Construction of the high-pressure DN 500 MOP 6.3 MPa gas pipeline between Łyszkowice and Łódź,” which is part of the investment titled: “Construction of the high-pressure DN 500 MOP 6.3 MPa gas pipeline between Łyszkowice and Łódź, including DN 200 branches towards Brzeziny and Koluszki, under the project to construct the Łyszkowice – Koluszki – Brzeziny – Łódź gas pipeline along with the infrastructure necessary for its operation in the Łódź Voivodeship.”
Scope: 79 km
Investor: Polska Spółka Gazownictwa Sp. z o.o.
Client: Antea Polska S.A.

Preliminary Design, Detailed Design, Construction Design, and Author’s Supervision for the Telecommunications Sector in the Construction of the High-Pressure Gas Pipeline Wronów – Rozwadów – Strachocina.
The work was carried out as part of two investment tasks:
“Preparation of Design Documentation for the DN1000 MOP 8.4 Gas Pipeline Wronów-Rozwadów” covering telecommunications design works (fiber optic and telemetry) – scope: 107 km.
“Preparation of Design Documentation for the DN1000 MOP 8.4 Gas Pipeline Rozwadów-Strachocina” covering telecommunications design works (fiber optic and telemetry) – scope: 140 km.
Investor: GAZ-SYSTEM S.A.
Contractor: Antea Polska S.A.

Modernization and expansion of telecommunications and power infrastructure necessary to ensure secure and reliable communication for access points interacting with mobile telecommunications devices.
As part of the project, we completed:
- Designing telecommunication cabinets with accompanying telecommunications and power infrastructure. Development of detailed technical plans, taking into account the specifications required by EXATEL and the Ministry of National Defense (MON).
- Construction and installation: Assembly of telecommunication cabinets and related telecommunications and power infrastructure at selected locations in the Kuyavian-Pomeranian and Warmian-Masurian Voivodeships.
- Configuration and testing: Configuration of devices and conducting functionality tests to ensure their optimal performance under operational conditions.
Scope: 4 facilities
Investor/Client: Exatel S.A.

Preliminary design, detailed design, construction design, and author’s supervision for the telecommunications sector for the task: “Expansion of the oil products pipeline Mościska – Nieporęt with a new fiber optic line.”
Scope: 23 km
Investor: PERN S.A.
Client: OTS IP Sp. z o.o.

Scope: 21 facilities
Investor/Client: Exatel S.A.

The work was carried out as part of the project to implement a management system at the Provincial Sanitary and Epidemiological Station in Bydgoszcz and 13 district sanitary and epidemiological stations in the Kuyavian-Pomeranian Voivodeship.
Scope: 13 facilities
Investor/Client: Exatel S.A.

Investor: NASK
Client: WASKO S.A.

Project: 37.7 km of FTTH telecommunications network, both underground and aerial.
Scope: Fiber optic connections for 1,433 households
Investor: Światłowód Inwestycje Sp. z o.o. (Orange Group S.A.)
Client: TeleArtNet Sp. z o.o.

Hanau Cluster 3
Projekt 108,9 km sieci telekomunikacyjnej w technologii FTTH.
Zakres: przyłącza światłowodowe dla 3 394 gospodarstw domowych
Inwestor: Deutsche Giga Netz GmbH
Zamawiający: MRK Media AG
Erfurt Cluster 4, Erfurt Cluster 5
Projekt 164 km sieci telekomunikacyjnej w technologii FTTH.
Zakres: przyłącza światłowodowe dla 4 126 gospodarstw domowych
Inwestor: Deutsche Giga Netz GmbH
Zamawiający: MRK Media AG
Bremen Blumenthal
Projekt 270 km sieci telekomunikacyjnej w technologii FTTH.
Zakres: przyłącza światłowodowe dla 8 417 gospodarstw domowych
Inwestor: Deutsche Giga Netz GmbH
Zamawiający: MRK Media AG

Project: 270.6 km of FTTH telecommunications network.
Scope: Fiber optic connections for 9,845 households
Investor: Deutsche Giga Netz GmbH
Client: MRK Media AG

Project: 285.6 km of FTTH telecommunications network.
Scope: Fiber optic connections for 8,591 households
Investor: Deutsche Giga Netz GmbH
Client: MRK Media AG

Project: 18.0 km of FTTH telecommunications network.
Scope: Fiber optic connections for 312 households
Client: Deutsche Giga Access GmbH

A total of 324 km of FTTH telecommunications network
Scope: Network and fiber optic connections for 26,260 households
Birkfeld Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 33.6 km of FTTH telecommunications network
Scope: Fiber optic connections for 1,218 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Frauental an der Lassnitz Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 26.1 km of FTTH telecommunications network
Scope: Fiber optic connections for 1,649 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Bad Schwanberg Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 13.2 km of FTTH telecommunications network
Scope: Fiber optic connections for 721 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Eggersdorf bei Graz Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 15.0 km of FTTH telecommunications network
Scope: Fiber optic connections for 951 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Hausmannstätten Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 10.4 km of FTTH telecommunications network
Scope: Fiber optic connections for 833 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Graz-Waltendorf 1 Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 50.0 km of FTTH telecommunications network
Scope: Fiber optic connections for 4,768 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Graz-Ries Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 51.5 km of FTTH telecommunications network
Scope: Fiber optic connections for 4,124 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Graz-St. Peter Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 39.2 km of FTTH telecommunications network
Scope: Fiber optic connections for 2,516 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Graz-Waltendorf 2 Area (Styria, Austria) – FTTH Network LLD (Low-Level Design) Project using RIMO Tool
Project: 23.6 km of FTTH telecommunications network
Scope: Fiber optic connections for 5,057 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)
Köflach Area (Styria, Austria) – Comprehensive FTTH Network Project using RIMO Tool
Project: 93.4 km of FTTH telecommunications network
Scope: Fiber optic connections for 6,199 households
Client: Österreichische Glasfaser-Infrastrukturgesellschaft (ÖGIG)

The work was carried out as part of the task “Development of project documentation along with author supervision,” which is part of the project titled: “Works on the E 75 Line on the Białystok-Suwałki-Trakiszki (border) section, Stage I, Białystok – Ełk.”
Scope: 16 passenger stations/stops
Investor: PKP PLK S.A.
Client: MGGP S.A.

The work was carried out as part of Task 1: “Conversion of overhead lines leased from PKP Telkol Sp. z o.o. to underground lines on railway line No. 137 from km 176.531 to km 215.322,” which is part of the project “Conversion of overhead lines leased from PKP Telkol Sp. z o.o. to underground lines.”
Scope: Design and construction of underground cable lines for SRK devices on railway line No. 137 on the section Kamieniec Ząbkowicki – Mościsko Dzierżoniowskie, with a total length of 39.4 km.
Investor/Client: PKP PLK S.A.

The work was carried out as part of partial task No. 3, which involves the preparation of radio planning documentation for railway line No. 85, as part of the investment titled: “Construction of railway line No. 85 on the section Warszawa Zachodnia – CPK – Łódź Niciarniana.”
Scope: Railway line No. 85, total length 120 km
Investor/Client: Centralny Port Komunikacyjny Sp. z o.o.

The work was carried out as part of the FTTH broadband network construction project under the Operational Program Digital Poland in the Inowrocław, Grudziądz, Kielce, Sandomierz-Jędrzejów, Piotrków, and Sieradz regions.
Scope: 2,525.2 km of underground and aerial FTTH network. Distribution network for 482 OLT areas, fiber optic connections to 726 schools.
Investor: Nexera Sp. z o.o.
Client: WASKO S.A. / Nexera Sp. z o.o.

The work was carried out as part of the FTTH broadband network construction project under the Operational Program Digital Poland in the Inowrocław, Grudziądz, Kielce, Sandomierz-Jędrzejów, Piotrków, and Sieradz regions.
Scope: 4,613.6 km of underground and aerial FTTH network. Distribution and subscriber network across 203 OLT areas for 99,434 households.
Investor: Nexera Sp. z o.o.
Client: Nexera Sp. z o.o. / WASKO S.A.

The work was carried out as part of the second call for the FTTH broadband network construction project under the Operational Program Digital Poland.
Scope: Design of 685.6 km of FTTH telecommunications network, both underground and aerial. Fiber optic connections for 9,760 households.
Investor: Nexera Sp. z o.o.
Client: Nokia Solutions and Networks Sp. z o.o.

Scope: Execution of construction works, installation, and delivery of materials for 8 stations.
Investor: PKP Polskie Linie Kolejowe S.A.
Client: Aldesa Construcciones S.A. Branch in Poland

Client/Investor: Centralny Port Komunikacyjny Sp. z o.o.

Service provided under the framework agreement with CPK for the preparation of project documentation for accompanying railway investments related to the construction of the Central Communication Port.
Client/Investor: Centralny Port Komunikacyjny Sp. z o.o.

Client/Investor: Centralny Port Komunikacyjny Sp. z o.o.