Always the highest standards

Drawing on the many years of experience of our employees and the best practices in the field of project implementation, we provide services for clients from the private and public sector at every stage of the process: from planning and design, to implementation, project implementation, and then maintenance and warranty service.

Among our projects, we can mention telecommunications and railway infrastructure projects for both national and local operators and clients. We have participated in projects of considerable importance for the development of telecommunications networks in Poland and Western Europe, in FTTH and P2P technologies.

We are also proud of our contribution to the development of environmentally friendly rail transport – we actively participate in the development of the railway traffic control system, which is of key importance not only for Polish railways, but also for the entire Three Seas region – the Baltic States and Central and Eastern Europe. The GSMR project we are implementing is the first step towards increasing railway safety and increasing the capacity of active connections. We face new challenges and global design standards – taking an active part in the design and supervision of the construction of new railway lines.

Construction of telecommunications networks of the ERTMS/GSM-R system infrastructure

Design and implementation of construction works as part of the investment entitled: “Construction of the ERTMS/GSM-R system infrastructure on the railway lines of Polskie Linie Kolejowe S.A. within the NPW ERTMS”.

Investor / Contracting authority

PKP Polskie Linie Kolejowe S.A.

Works carried out as part of the task: “Implementation of the ERTMS/ETCS level 2 system, along with the construction of LCS and an automatic line blockade on the section of railway line No. 4, Korytów – Zawiercie”, which is part of the project entitled “Modernization of railway line No. 4 – Central Railway Main Line, stage II” on the section: Włoszczowa Północ – Psary – Góra Włodawska – Zawiercie.
Range: length 72.5 km
Investor / Contracting authority: PKP PLK S.A.
Employer: Rail Engineering Sp. z o. o.

Works carried out as part of the investment task: “Construction of the Skoczów-Komorowice-Oświęcim-Tworzeń gas pipeline along with the infrastructure necessary to operate it in the Małopolskie and Śląskie voivodeships. Stage II High-pressure gas pipeline DN700 MOP 8.4 MPa from Oświęcim to Tworzeń (Sławków) together with the Oświęcim System Reduction and Measurement Station.
Range: 53 km
Investor: GAZ SYSTEM S.A.
Contracting authority: Antea Polska S.A.

Works carried out as part of task No. 2: “Construction of a high-pressure gas pipeline MOP DN 500 6.3 MPa between Łyszkowice and Łódź”, which is part of the investment entitled: “Construction of a high-pressure gas pipeline MOP 6.3 MPa DN500 between Łyszkowice and Łódź with DN200 in the direction of Brzeziny and Koluszki as part of the task of construction of the Łyszkowice – Koluszki – Brzeziny – Łódź gas pipeline, together with the infrastructure necessary to operate it in the Łódź Voivodeship.

Range: length 79 km
Investor: Polska Spółka Gazownictwa Sp. z o. o.
Contracting authority: Antea Polska S.A.

The work was carried out as part of the management system implementation project at the Provincial Sanitary and Epidemiological Station in Bydgoszcz and 13 poviat sanitary and epidemiological stations in the Kuyavian-Pomeranian Voivodeship.
Scope: 13 objects
Investor/ Contracting authority: Exatel S.A.

Scope: 95 educational units
Investor: NASK
Contracting authority: WASKO S.A.

Project of 37.7 km of telecommunications network in FTTH technology, underground and overhead.
Scope: fiber optic connections for 1,433 households
Investor: Fiber Inwestycje Sp. z o. o. (Orange S.A. Group)
Contracting authority: TeleArtNet sp. z o. o.

Project of 270.6 km of telecommunications network in FTTH technology.
Scope: fiber optic connections for 9,845 households

Investor: Deutsche Giga Netz GmbH
Contracting authority: MRK Media AG

Project of 285.6 km of telecommunications network in FTTH technology.
Scope: fiber optic connections for 8,591 households

Investor: Deutsche Giga Netz GmbH
Contracting authority: MRK Media AG

Project of 18.0 km of telecommunications network in FTTH technology.
Scope: fiber optic connections for 312 households
Contracting authority:: Deutsche Giga Access GmbH

The works were carried out as part of the task “Development of design documentation together with author’s supervision” which is part of the project entitled: “Works on the E 75 line, section Białystok-Suwałki-Trakiszki (state border), stage I, section Białystok – Ełk”.
Scope: 16 stations/passenger stops

Investor: PKP PLK S.A.
Contracting authority: MGGP S.A.

Works performed under task 1: “Establishment of overhead lines leased from PKP Telkol Sp. z o. o. for underground lines on railway line No. 137 from km 176.531 to km 215.322” in the project “Development of overhead lines leased from PKP Telkol Sp. z o. o. for earth lines”.

Scope: Design and construction of an underground cable line for the SRK devices on the railway line No. 137, section Kamieniec Ząbkowicki – Mościsko Dzierżoniowskie, total length 39.4 km

Investor/ Contracting authority: PKP PLK S.A

Works performed as part of partial task No. 3, i.e. preparation of radio planning documentation for railway line No. 85, which is part of the investment entitled: “Construction of railway line No. 85 on the section Warszawa Zachodnia – STH – Łódź Niciarniana (without the section within the STH railway junction)” .
Scope: railway line No. 85, total length 120 km

Investor/ Contracting authority: Centralny Port Komunikacyjny Sp. z o. o.

The work was carried out as part of the FTTH broadband network construction project of the Polish Digital Operational Programme in the regions of Inowrocław, Grudziądz, Kielce, Sandomierz-Jędrzejów, Piotrków, and Sieradz.
Scope: 2,525.2 km of underground and overhead networks in FTTH technology. Distribution network for 482 OLT areas, fiber optic connections to 726 schools.

Investor: Nexera Sp. z o. o.
Contracting authority: WASKO S.A./Nexera Sp. z o. o.

The work was carried out as part of the FTTH broadband network construction project of the Polish Digital Operational Programme in the regions of Inowrocław, Grudziądz, Kielce, Sandomierz-Jędrzejów, Piotrków, and Sieradz
Scope: 4,613.6 km of underground and overhead networks in FTTH technology. Distribution and subscriber network in 203 OLT areas for 99,434 households.

Investor: Nexera Sp. z o. o.
Contracting authority: Nexera Sp. z o. o. / WASKO S.A.

The work was carried out as part of the second call for proposals for the construction of a broadband FTTH network under the Digital Poland Operational Programme.
Scope: design of 685.6 km of telecommunications network in FTTH technology, underground and overhead. Fiber optic connections for 9,760 households.

Investor: Nexera sp. z o. o.
Contracting authority: Nokia Solutions and Networks Sp. z o. o.

Works carried out under the Operational Programme Infrastructure and Environment 2014-2020, measure 5.2. Development of rail transport outside TEN-T.
Scope: execution of construction works, installation and delivery of materials for 8 stations.

Investor: PKP Polskie Linie Kolejowe S.A.
Contracting authority: Aldesa Construcciones S.A. branch in Poland

Service provided under the framework agreement with the STH for the provision of Contract Engineer services for accompanying railway investments related to the construction of the Solidarity Transport Hub.
Employer/ Contracting authority: Centralny Port Komunikacyjny Sp. z o. o.

Service provided under the framework agreement with the STH for the provision of Contract Engineer services for accompanying railway investments related to the construction of the Solidarity Transport Hub.
Employer/ Contracting authority: Centralny Port Komunikacyjny Sp. z o. o.

Design, construction and implementation of stage 2A of the traffic management system for the concession section of the A4 motorway Katowice-Kraków, Construction of telecommunications connections and poles of rotating cameras km: 341+636 – km: 401+100.

Modernization of the existing system of weather stations on the concession section of the A4 Katowice-Kraków motorway, modernization of the existing weather stations along with the measuring infrastructure km: 341+636 – km: 401+100.